Project Details
Sewer lift station and sanitary extension bore under U.S. Route 173 in Harvard, L. The Sanitary lift station was installed 15ft. under the existing water table. A total of 2,500 ft of water main, 2,000 ft of RCE storm sewer and 230ft of box culvertswere installed.