Project DetailsRegional Reservoir No. 1 Bakke Industrial Park Transmission MainOwnerWestern Area Water Supply AuthorityScopeInstalled 46,000 LF (14021 meters) of 30” (762 mm) and 24” (610 mm) DIP Water Transmission Album navigationPreviousPrevious album:The Abbey MarinaNextNext album:Water Main