1030 96th St
Project Details This job was located at a residential house in Marathon. The project included the demolition of the previous existing concrete dock and the installation of a new timber marginal dock with synthetic decking.
Harvard Industrial
Project Details Sewer lift station and sanitary extension bore under U.S. Route 173 in Harvard, L. The Sanitary lift station was installed 15ft. under the existing water table. A total of 2,500 ft of water main, 2,000 ft of RCE storm sewer and 230ft of box culvertswere installed.
Indian Ridge
Project Details 21,000 linear ft of 12’-24’ storm sewer, 500 flared end sections, and 160 catch basins and manholes were installed throughout an existing residential subdivision. Located in Wonder Lake, IL
Reclamation Services
Project Details
Marshall Rd
Project Details Installation of a 1.9-mile-long storm sewer box culvert. Located at Marshall Rd in San Antonio, TX.
FM-1976
Project Details Installation of a 2.1-mile-long storm sewer and water main pipe located in Windcrest, TX.
De Zavala Rd
Project Details Installation of a 4.4-mile-long storm sewer box culvert. Located in San Antonio, TX