Project Details Captain Pip’s Marina and Hideaway is a marina located in Marathon that was damaged from Hurricane Irma. We demolished 2 of their existing docks and installed 3 brand new docks with a 70’ long walkway connecting them.
Project Details Sunrise Isle Canal was a project that we completed for the Sunrise Isle Canal Homeowner’s Association. The project was to maintenance dredge the existing, very large canal. We removed 23,000 cyds in the short time span of 30 days.
Project Details Sunset Point Farm Dredging is a residential property located in Marathon. We completed the removal of 3,400 cyds of excess material from the canal so it could once again be navigated by boats. This project was completed in 10 days. Pictures Coming Soon…
Project Details Captain Quarter’s Condo Associates is located in Marathon.This project consisted of demolishing 6 existing L-Docks and replacing them as new. We installed a total of (78) pilings and 1,700 SF of framing and decking.
Project Details Ocean Breeze located in Marathon, is a community of residential homes. At this project we installed 1,000’ of watermain, sanitary sewer, and storm sewer on the civil side. On the marine side we installed 250’ of steel seawall and a 180’ long T-Dock with 36 mooring piles.
Project Details Located in Stock Island, we demolished and installed a new 650’ long steel seawall with a concrete cap.
Project Details Located in Stock Island, at this location we demolished 3 existing docks and installed a new 115’ timber boardwalk. Pictures Coming Soon…
Project Details The Boy Scout Sea Base located in Islamorada had a previous existing dock damaged from Hurricane Irma. Our company was able to provide them our services by removing 18 pilings, 400 SF of decking, and 1 concrete pile. We reinstalled new pilings, replaced the decking, reinstalled existing fiberglass grating, and installed a 30’…