Project Details We installed (2) brand new T Docks at this location. Both docks included the appropriate amount of mangrove trimming followed by the installation of 60 pilings and 140’ of dockage.
Project Details This marina, located in marathon was given a complete overhaul. All of the existing docks and mooring piles were demolished and replaced by 6 finger piers, 50 mooring piles, a 160’ long boardwalk, 140’ long L Dock, and a brand new 180’ long concrete seawall with a 20×20 concrete platform supported by concrete…
Project Details For this project we maintenance dredged 5,000 cyds of material to restore navigation capabilities to 3 adjacent boat basins and the canal that connects them all. We completed this project in 9 days. Pictures Coming Soon…
Project Details Demolition and haul off a single story duplex. Pictures Coming Soon…
Project Details To residential members on Gulfstream blvd in Marathon by maintenance dredging, hauling off, and disposing material from their existing channel, boat basin, and canal. Allowing them easier access to get in and out of the channel. Pictures Coming Soon…
Project Details This dredging project was to remove 2,000 cyds from an existing residential channel and boat basin. We completed this project in 7 days.
Project Details We were contracted by the Duck Key Homeowners Association to complete maintenance dredging of their canals that have been filled in over years of storms. 5 different locations of the duck key canal system were dredged to restore proper flow and access making sure that the canals will stay pristine for many more…
Project Details This project took place on a remote island in the Gulf of Mexico. Being located on an island there was no way to bring fill to the project via traditional methods. With that being said our custom made hopper barges and push boats were the perfect tool for the job. We transported thousands…
Project Details Captain Pip’s Marina and Hideaway is a marina located in Marathon that was damaged from Hurricane Irma. We demolished 2 of their existing docks and installed 3 brand new docks with a 70’ long walkway connecting them.