Water Main

Project Details LPS Utilities contracted with the Western Area Water Supply Authority to provide a large scale water main which needed to be built to help handle the rapid economic development in the area due to the shale oil boom. – 19,000 ft of 30″ DIP watermain with blow off and air release assemblies. -…

Southwest Bexar Sewer Pipeline

Project Details Regional Reservoir No. 1 Bakke Industrial Park Transmission Main Owner Western Area Water Supply Authority Scope Installed 46,000 LF (14021 meters) of 30” (762 mm) and 24” (610 mm) DIP Water Transmission

Marine Construction Experts
Marine Construction ExpertsMarine Construction ExpertsMarine Construction Experts

The Abbey Marina

Project Details The Abbey Marina in Fontana, WI. We were contracted to completely rehab the 80 year old marina. This included the installation of piles, sheeting, deadmen, new storm sewer, electrical, plumbing, concrete curb, concrete sidewalk, docks, whalers, and landscaping. As well as the demolition of the site prior to construction.

Helipad – Central DuPage Hospital

Project Details Helipad – Central DuPage Hospital Owner Central DuPage Hospital Scope Deliver helipad for Central DuPage Hospital with a four month deadline. Began construction in January and completed in April. Constructed reinforced concrete landing pad which was elevated above the adjacent pond bottom. Work included extreme winter conditions with near impossible completion date. Passed…

Springbrook Prairie Pavilion

Project Details Springbrook Prairie Pavillion GC Weis Builders, Inc. – Marryman Excavation, Inc. Scope Site Utility installation for 20 acre retail development. Installed a 13 acre-feet StormTrap Detention System over a 10 day period, two months ahead of schedule. Installed 14,900 If (4541 meters) of Sanitary, Water and Storm Pipe. Coordinated the efficient delivery of…

Hampshire Interceptor

Project Details LPS Contracting contracted with the Village of Hampshire to install this six mile long sanitary sewer transmission line. This project required LPS’s dewatering expertise and innovation due to the extreme installation depths and high-water table. – 11,000 ft of 36″ sanitary sewer trunk line. – (4) 440 ft EA 54″ auger and jack…

Brookside Meadows – Marengo IL

Project Details LPS Utilities contracted with Brackmann Development to install the site utilities for this 120 lot residential development located in Marengo, IL – 200 ft of precast ConSpan Bridge – 6,000 ft of watermain – 5,000 ft of sanitary sewer

Key Colony Beach Club

Project Details Key Colony Beach Club is located in grassy key. This job consisted of a complete demo of (2) two story condo building. In addition to the demo we installed a new 1,000’ storm sewer system and imported and compacted fill to raise the pad elevations 1 foot for the future parking garage. Pictures…

Pelican RV Dredging

Project Details Pelican RV Dredging is a resort located in Grassy Key. Their marina basin was completely unusable as it was full of decomposed seagrass to the point where there was 0 water depth. We removed 1,200 cyds of material from this property to restore the boat basin to usable conditions. Pictures Coming Soon…