Coco Plum

Project Details We installed (2) brand new T Docks at this location. Both docks included the appropriate amount of mangrove trimming followed by the installation of 60 pilings and 140’ of dockage.

Marine Construction Experts
Marine Construction ExpertsMarine Construction ExpertsMarine Construction Experts

39th Street

Project Details This marina, located in marathon was given a complete overhaul. All of the existing docks and mooring piles were demolished and replaced by 6 finger piers, 50 mooring piles, a 160’ long boardwalk, 140’ long L Dock, and a brand new 180’ long concrete seawall with a 20×20 concrete platform supported by concrete…

Lime Lane Dredging

Project Details For this project we maintenance dredged 5,000 cyds of material to restore navigation capabilities to 3 adjacent boat basins and the canal that connects them all. We completed this project in 9 days. Pictures Coming Soon…

Duck Key Dredging

Project Details We were contracted by the Duck Key Homeowners Association to complete maintenance dredging of their canals that have been filled in over years of storms. 5 different locations of the duck key canal system were dredged to restore proper flow and access making sure that the canals will stay pristine for many more…

Marabella Project

Project Details This project took place on a remote island in the Gulf of Mexico. Being located on an island there was no way to bring fill to the project via traditional methods. With that being said our custom made hopper barges and push boats were the perfect tool for the job. We transported thousands…